You don't have javascript enabled. Good luck with that.
Pencarian
Butuh Waktu 13 Jam Padamkan Kebakaran di Kawasan Pasar Gembrong

East Jakarta Firefighters Deal with Gembrong Market Fire for 13 Hours

It takes 13 hours for firefighters from the East Jakarta Fire Handling and Rescue (Gulkarmat) Sub-agency to deal with the fire in Gembrong Market area, Jl. Basuki Rahmat RW 01 Cipinang Besar Utara, Jatinegara from extinguishing and cooling process.

We started dealing with fire on Sunday at 21:30 until the cooling ended on Monday at 10:22

According to Gatot Sulaeman, Section Head of East Jakarta Gulkarmat Sub-agency's Fire Control and Rescue, the main difficulty faced by the team was the lack of water resources thus they had to go back and forth to East Flood Canal (KBT) to collect water.

Moreover, the unfavorable conditions at the location forced firefighters to carry out a lot of maneuvers to extinguish the fire.

Firefighters Put Out Flames in Gembrong Market Area This Morning

"We started dealing with a fire on Sunday at 21:30 until the cooling ended on Monday at 10:22," he conveyed, Monday (4/25).

His side deployed 27 fire trucks and 135 firefighters to extinguish the fire. There were no casualties or victims injured in the incident. But, 450 families or about 1,000 people across 5 RTs had to lose their homes.

"Currently, some fire trucks are still on standby at the scene," he mentioned.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye916 personAldi Geri Lumban Tobing
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye811 personAldi Geri Lumban Tobing
  3. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye644 personAldi Geri Lumban Tobing
  4. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye495 personAldi Geri Lumban Tobing
  5. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye486 personAldi Geri Lumban Tobing